Brick Manufacturing Process:  Setting and Drying

soft mud bricks ready for setting/ drying stage

extruded bricks

Previous / Next

 

INTRODUCTION

After molding the brick unit through either extrusion or soft mud process, bricks go through the setting and

drying stage. Before they enter the kiln to be fired, the green bricks must be correctly dried.

The moisture must be minimized to prevent certain defects and shrinkage from

happening when fired at extreme heat in the kiln. Shrinkage can cause the bricks to crack

or even fall off the car.

INTRODUCTION

SETTING MUD BRICK

SETTING EXTRUDED BRICK

PRE-DRYING

DRYING

CLOSING

Stage Index Page