Welcome to the CEE 536 Home Page!

This site provides general information about the course, as well as files for students to download.
Please make a selection from the list on the left.

CEE 536 Critical Path Methods (3 credits)

Prerequisites: CEE536 can be taken by engineering, architecture, and business students with at least some design experience.

Course Description

    Construction project planning, scheduling, and control, using activity-on-arrow, activity-on-node, and overlapping network models. CPM: Start, finish, float, critical path calculations. PERT: Probabilistic scheduling, merge-event bias, schedule simulation. Time-cost tradeoff, resource allocation, resource leveling algorithms. Cost-schedule integration, computerized control systems. Repetitive scheduling. Case studies, term project.

   