ChE 344
Problem Set 14
Due Tuesday, March 11, 2008 (Lecture 17)


PLQ 16 - How would Example 8-1 change if a CSTR were used instead of a PFR? What is the difference between "flow work" and "shaft work"?

Group Assignment

  1. P7-1A (f) (omit f(2))
  2. P7-4B
  3. P7-14
  4. P7-16B [omit (b), (e), (f) and (h)]

Individual Assignment

  1. P7-2   ICM Enzyme Man
    Email Performance number to csweet.goblue@gmail.com with the subject line:
    "che344 icm - Enzyme Man"